Wind farm landscape

03 / Wind energy

Wind generation and the grid behind it

Turbine systems, civil works, collection networks and the substations and lines that carry the power to demand.

03 / Wind investment

From wind resource to an integrated generating asset

Wind development links the resource, turbine system, civil works, collection network and power-evacuation route.

Wind turbine blade

Develop the opportunity

Evaluate opportunities against regional energy plans, site constraints, infrastructure access and network conditions.

Coordinate the plant and grid

Connect feasibility, preliminary and detailed design with collection systems, substations and connection studies, incorporating storage and control strategies where the system requires them.

Improve existing assets

Assess turbine replacement, model changes and related infrastructure modifications against wind-farm compatibility and performance.

Wind farm landscape
Wind turbines in a field

Guazhou Beidaqiao wind farm

70 MW

Installed capacity

June 2024

Full-capacity operation

Guazhou wind farm
Wind farm turbines

A wind-generation project in Guazhou, Gansu, within a region developing wind, solar and storage resources.

Urad Middle Banner wind project

80 MW

50 MW + 30 MW phases

110 kV

Substations and evacuation

Wind turbine
Electrical substation

Two phases include 110 kV substations and evacuation infrastructure with an overall line length of approximately 70 km. Commissioning was recorded in late 2022 and October 2023.

03 / Integrated developments

Generation planned around industrial demand

Baotou: a source-grid-load-storage configuration

Aerial view of the Baotou industrial energy site

1,005 MW

Renewable design scope

705 / 300 MW

Wind / solar

275 MW / 4 h

Storage

Construction site with crane
Construction site with scaffolding

Design scope includes two 220 kV collection substations, a 220 kV central substation, a 110 kV customer substation and about 80 km of 220 kV lines. Partial commissioning was recorded in 2025.

Hohhot: green power for an industrial park

Aerial view of the Hohhot solar farm

300 + 300 MW

Solar + wind

90 MW / 4 h

Storage

220 kV

Collection and supply

Wind turbine
Electrical substation

Serving the Tuoqing Economic Development Zone, with wind and solar generation connecting through 220 kV infrastructure to a new storage station. Grid connection was recorded in December 2024.

04 / Grid engineering

Engineering the connection from generation to demand

Grid access and network design are fundamental to the viability and operability of a renewable-energy project.

Electrical substation infrastructure

Planning and connection

Energy planning, early-stage project assessment, connection-system studies and grid-related technical research.

Construction site of electrical infrastructure

Transmission and substations

Design coverage across 35–220 kV line and substation applications, including renewable-plant collection and evacuation infrastructure.

Wind turbines and transmission towers at sunset

Integrated engineering

Coordinate electrical, civil, structural and control interfaces across PV, wind, storage, substations and customer facilities.

220 kV infrastructure: from engineering to site execution

Ordos high-tech industrial development zone: a supply-infrastructure reference comprising two 220 kV substations, with whole-process technical and cost-consulting support recorded in 2025.

Civil works and structural coordination

Civil works and structural coordination

On-site technical and construction review

On-site technical and construction review

Foundation works and site preparation

Foundation works and site preparation

Equipment-building construction

Equipment-building construction

Civil interfaces for electrical infrastructure

Civil interfaces for electrical infrastructure

Substation buildings and delivery planning

Substation buildings and delivery planning

A disciplined route from feasibility to commissioning

  1. 01

    Define

    Resources, demand, constraints and project objectives.

  2. 02

    Study

    Feasibility, options, connection and technical boundaries.

  3. 03

    Design

    Multidisciplinary drawings and equipment interfaces.

  4. 04

    Deliver

    Site coordination, integration and acceptance support.

  5. 05

    Operate

    Maintenance information, monitoring and improvement.

Engineer reviewing documents at a desk
Engineers at a solar site
Engineers inspecting power lines

Feasibility / detailed design / site coordination / operating readiness

Contact

Building the next energy system.

Solar investment. Wind investment. Grid engineering. Energy storage R&D, manufacturing and intelligent operations. Tell us about your site, load profile or project stage and our engineering team will respond with a suitable configuration.

Company
JUNO POWER CORPORATION
Capabilities
Solar & wind investment · Grid engineering · Storage R&D and manufacturing · Digital energy operations

Send an enquiry